THE PROSPECT OF MINIMISING PRODUCTION FLOW WASTE ON CONSTRUCTION SITES IN NIGERIA THROUGH THE LAST PLANNER® SYSTEM
TABLE OF CONTENTS
Title Page i
Declaration ii
Approval Page iii
Dedication iv
Abstract vi
Table of Contents vii
CHAPTER ONE: INTRODUCTION
1.1 Background of the study 1
1.2 Historical background
1.3 Statement of the General Problem 4
1.4 Objective of the study 5
1.5 Significance of Study 5
1.6 Statement of Hypothesis 6
1.7 Scope of the study 6
1.8 Limitation of the study 7
1.9 Definition of Terms 7
CHAPTER TWO: LITERATURE REVIEW
2.0 Introduction 9
2.1 Review of related literature 9
2.2 Theoretical framework
2.3 Summary of Review 33
CHAPTER THREE: RESEARCH METHODOLOGY
3.1 Introduction 35
3.2 Research Design 35
3.3 Area of study 35
3.4 Population of the study 36
3.5 Sample size 36
3.6 Instrument for data collection 36
3.7 Reliability of the Instrument 37
3.8 Validity of the Instrument 38
3.9 Method of Data Collection 38
3.10 Method of Data Analysis 39
CHAPTER FOUR: DATA PRESENTATION AND ANALYSIS
4.1 Introduction 41
4.2 Characteristics of the Respondents 41
4.3 Presentation of Data Analysis 43
4.4 Discussion of Findings 48
4.5 Summary of Findings 49
CHAPTER FIVE: SUMMARY, CONCLUSION AND RECOMMENDATIONS
5.1 Summary 51
5.2 Conclusion 52
5.3 Recommendation 53
Biography 54
Appendix 56
THE PROSPECT OF MINIMISING PRODUCTION FLOW WASTE ON CONSTRUCTION SITES IN NIGERIA THROUGH THE LAST PLANNER® SYSTEM, GET MORE BUILDING TECHNOLOGY PROJECT TOPICS AND MATERIALS